Lunar end, and good news, Ann division subsidiary Shenzhen wei da medical system engineering co., LTD. Won the university of Chinese Academy of Sciences, Shenzhen hospital (light) new hospital project (original bright district people's hospital new hospital construction engineering) medical clean engineering equipment procurement and installation blocks, for the traditional rabbit pictures on a perfect full stop, also created a year for the dragon year of a good start.
It is understood that the project is located in the light district hai north ring avenue and rich road interchange, positioning for tertiary first-class general hospital, covers an area of about 50000 square meters, a total investment of about 3.35 billion, construction area of 337000 square meters, proposed total size 1500 beds, is one of the key projects in Shenzhen, undertake the light district medical service level, improve the Shenzhen and a large bay area of Guangdong medical and health system.
Security subsidiary wei da medical the winning project bid project mainly includes medical complex clinical laboratory, EICU, hemodialysis center, center, supply, delivery room, blood transfusion, static center, inpatient department, neonatology, specialized ICU, pathology, research laboratory, infection laboratory and PCR laboratory construction, water supply and drainage, electrical, hvac, fine decoration, radiation protection, intelligent, medical gas and other professional engineering pipeline, materials, equipment procurement, installation, installation and acceptance.